Afghanistan's Web Site: Afghanistan | Afghan HomepageHopefully Peace is coming to Afghanistan after 40 years of War
Web Site Home >
Forum Home Forum Home >Afghanistan News >Afghanistan News
  New Posts New Posts
  FAQ FAQ  Forum Search   Events   Register Register  Login Login


Please Register to have your voices heard. Silence will not make the world a better place!

$5m transformer activated in Jalalabad city

 Post Reply Post Reply
'
Author
Message
AfghanistanNews View Drop Down
Admin Group
Admin Group

Afghanistan's Web Site News

Joined: 01-Jan-2011
Location: USA
Status: Offline
Points: 2348
Post Options Post Options   Thanks (0) Thanks(0)   Quote AfghanistanNews Quote  Post ReplyReply Direct Link To This Post Topic: $5m transformer activated in Jalalabad city
    Posted: 10-Jun-2017 at 1:12am
$5m transformer activated in Jalalabad city, resolving 75% of load shedding

The third electricity transformer was activated in Jalalabad city, the provincial capital of eastern Nangarhar province of Afghanistan, resolving up to 75 percent of load shedding which previously affected the city residents.

Built with a cost of $5 million, the third transformer was activated by the provincial governor Mohammad Gulab Mangal who said the activation of the transformer has paved the way for the supply of an additional 40 mega watt of electricity which was previously 72 megawatts.

Mangal further added that the activation of the third transformer by the Da Afghanistan Breshna Sherkat has paved the way for the supply of electricity for up to 16 thousand residents of Jalalabad.

He said the work on installation of electricity pillars for the supply of an additional 220 mega watt electricity will also start in the near future.

According to Mangal, the survey work for the installation of pillars will start soon and with the completion of the project, electricity will be supplied to all the districts of Nangarhar besides supply electricity to the other eastern provinces.

In the meantime, the head of Da Breshna Sherkat Eng. Mohammad Nasir Quraishi said the activation of the third transformer has also paved the way for the supply of electricity from Naghlo dam having a capacity of 45 mega watt.

http://www.khaama.com/5m-transformer-activated-in-jalalabad-city-resolving-75-of-load-shedding-02897

Back to Top
Sponsored Links


Back to Top
 Post Reply Post Reply
" data-numposts="5">
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.01
Copyright ©1997-2018 Afghanistan's Web Site. All rights reserved

This page was generated in 0.203 seconds.

Golden Words By Khan Abdul Ghafar Khan (Bacha Khan)